Kexin Shengcai Kexin Cloud Data Center

INFRASTRUCTURE

Infrastructure

A data center campus built and operated to financial-grade standards.

Campus

4.9 hectares, 3 purpose-built data center buildings and about 4,000 racks in operation.

Power

A highly reliable power architecture backed by UPS and diesel generators.

Cooling

Efficient cooling and fine-grained energy management, for a PUE of about 1.35 that keeps falling.

Network

Multi-carrier connectivity for colocation and AI workloads.

Security

Multi-level access control, video surveillance and personnel management across campus and halls.

Operations

24/7 on-site staff, standardized procedures and emergency response.

Contact sales for detailed power capacity, cooling design and carrier options.

HOW PUE WORKS

PUE, explained with one rack

PUE (power usage effectiveness) = total facility power ÷ IT equipment power. The closer to 1, the more efficient. Part of the cooling and power distribution is a fixed overhead, so the fuller the load, the lower the PUE.

Move your pointer over the figure, or tap it, to set how many servers are online, and watch the fan speed and the PUE needle change.